CAO Cases

Arne Hoel, The World Bank

Europe & Central Asia

Georgia / BTC Pipeline-13/Tsalka

Complainant
Residents of Tsalka
Date Filed
July 22, 2004
Case Status
Closed
 

Synopsis

Complaint The Baku-Tbilisi-Ceyhan (BTC) oil and gas pipeline is a 1,768 km long crude oil pipeline stretching from the Caspian Sea to the Mediterranean Sea. It is the second longest oil pipeline in the world and passes through Azerbaijan, Georgia and Turkey. IFC has invested $250 million since 2003 and the total project cost is approximately $3.6 billion. The project is operated by BTC Co., which comprises a consortium of 11 partners. To date, CAO has received 33 complaints in relation to the project ranging from individuals to communities to local organizations. On July 22, 2004, the CAO received a complaint from Tsalka residents claiming that a pipeline construction work camp in their village had caused homes to flood, due the absence of adequate storm water management during construction of the camp, and an increase in the impermeable surface area in the locality. CAO Action The CAO accepted the complaint on August 2, 2004, and an assessment report was released on November 24, 2004. The CAO recommended that BTC Co.’s and their subcontractors’ grievance recourse mechanism process be streamlined. After follow-up inquiries, CAO found that BTC Co. and its subcontractor, Spie-Capag and Petrofac Joint Venture (SPJV), had responded to some of the complainants’ claims by compensating some individuals and repairing municipal roads and ditches. Current Status CAO closed the complaint on May 2, 2005.

Project information

Institution
IFC
Project Name & Number
Baku Tbilisi-Ceyhan Pipeline 11251
Department
Oil, Gas, Mining, & Chemicals
Company
Baku Tiblisi-Ceyhan Pipeline
Sector
Oil, Gas and Mining
Region
Europe & Central Asia
Country
Georgia, Turkey and Azerbaijan
Environmental Category
A
Commitment
$125 million (A loan) $125 million (B loan)

Case Tracker

Ombudsman

  • Eligible: Completed
  • Assessment Period: Completed
  • Facilitating Settlement: Completed
  • Monitoring/Close-out: Closed

Compliance